In November 2019, the capital city of Tanzania, Dodoma, began construction of a new substation as part of its urban infrastructure expansion. Xinghe Group, together with a local electric company, successfully won the tender to supply key power equipment for this project. After the substation was completed, it received high praise from the end user. Therefore, the customer chose to cooperate with Xinghe again on subsequent projects.
Dodoma, the political capital of Tanzania, has been undergoing rapid development. Reliable electricity distribution is critical for government offices, residential areas, and commercial zones. The new substation was designed to:
Xinghe Group partnered with a reputable local electric company to bid for the tender. Our proposal offered high‑quality transformers and switchgear at competitive terms, along with technical support.
| Item | Details |
|---|---|
| Project location | Dodoma, Tanzania |
| Completion date | November 2019 (project completed) |
| Equipment supplied | Power transformers, compact substations, switchgear (custom specification) |
| Local partner | Local electric company |
Xinghe provided engineering consultation, manufacturing, and delivery of the main power equipment. Our team also offered free installation guidance to ensure correct on‑site assembly.
After the substation was commissioned:
✅ Direct quote from customer feedback (paraphrased): “Xinghe delivered reliable transformers on schedule. Their engineers answered all our questions during installation. We are very satisfied.”
Because the Dodoma substation project was successful, the same customer cooperated with Xinghe again on later projects. This repeat business includes additional transformer supply for network expansion in other Tanzanian regions.
Therefore, the November 2019 project became a reference case for Xinghe in East Africa.

Contact a Xinghe representative today to learn more about our Transformer.